Our Latest Projects

Our 1.9 ton excavator in action!

1.9 ton excavator with 3 buckets and ripper, breaker and augers, available for wet/ dry hire. Has long dipper arm for good reach ! The tracks can narrow in for tight access and we have very reasonable rates! Give Fintan a call to see if this will work for your...

Terex R265T added to our fleet

Brand New Terex R265T added to Tracklinkwa wet/dry Hire Rental Fleet today. The R265T compact track loader has a 74-horsepower Tier 4-Final engine. The radial-lift unit’s operating weight is 9,180 pounds and it has an operating capacity of 2,650 pounds and a tipping...

A new face for our vehicles

We are pretty excited to showcase our new utes!  Don’t they look awesome with their new clothes on. . . check us out on the road...

ASV VT-70 Compact Track Loader

Brand New ASV VT 70 added to our fleet today! First one in WA and we are sending it off to Exmouth The vertical-lift VT-70 CTL has a rated operating capacity of 2,328 pounds and a tipping load of 6,650 pounds. The Kubota turbocharged diesel engine provides 65...

Sitech WA TechNews Article

Sitech WA TechNews Article Article by SITECH WA BDM Brad Dalton. Fintan Kelleher, Proprietor of TrackLink WA recently decided to fit his compact track loader with a Trimble GCS900 system to allow him to offer a compact machine control solution to the Western...

Port Hedland Project

TracklinkWA are all set for our road trip top to Port Hedland with our full 3D automated laser grading system for completing bedding accuracy on water mains pipeline in Port Hedland. Will they come back this clean??  I think not!...

$12m Marmion Road Upgrade Project

As part of the main roads Traffic Congestion Management Project, TracklinkWA was been selected to provide the Laser Grading for the upgrading of the intersections of Marmion Avenue with Hepburn and Whitfords Avenues to improve traffic flow and safety. This $12 m...